Manly Observer provides a weekly summary of development applications lodged with Northern Beaches Council in the last week.
While every effort has been made to accurately represent the development applications, we recommend clicking the link (the DA number in the heading) which will take you to the relevant council page with detailed information.
Where exhibition periods have not yet been determined at the time of publication, Council is still gathering the required documention needed before notifying relevant parties. Once the exhibition period opens, there will be a link on the DA page for submissions – please refrain from submitting prior to this link becoming available.
A
53 Roosevelt Avenue, Allambie Heights – DA2025/0478
Exhibition Period: 21/05/2025 to 04/06/2025
Cost of Work: $606,142
Alterations and additions to a house, including a swimming pool.
38 Cabarita Road, Avalon Beach – DA2025/0482
Exhibition Period: 22/05/2025 to 05/06/2025
Cost of Work: $0
Use of existing domestic waterfront structures and berthing area.
61 Dolphin Crescent, Avalon Beach – DA2025/0516
Exhibition Period: 22/05/2025 to 05/06/2025
Cost of Work: $253,000
Alterations and additions to a house.
B
26 Lentara Road, Bayview – DA2025/0511
Exhibition Period: 22/05/2025 to 05/06/2025
Cost of Work: $438,350
Alterations and additions to a house.
C
5 Graylind Close, Collaroy – DA2025/0509
Exhibition Period: 22/05/2025 to 05/06/2025
Cost of Work: $2,510,825
Construction of a house, including a swimming pool.
43 Idaline Street, Collaroy Plateau – DA2025/0476
Exhibition Period: 21/05/2025 to 04/06/2025
Cost of Work: $329,340
Alterations and additions to an approved house.
212 Hudson Parade, Clareville – DA2025/0508
Exhibition Period: 22/05/2025 to 05/06/2025
Cost of Work: $237,930
Construction of an inclinator and associated works.
D
37 Bushey Place, Dee Why – DA2025/0462
Exhibition Period: 20/05/2025 to 03/06/2025
Cost of Work: $440,000
Alterations and additions to a garage and construction of a secondary dwelling.
E
111 Woorarra Avenue, Elanora Heights – DA2025/0423
Exhibition Period: 21/05/2025 to 04/06/2025
Cost of Work: $354,799
Construction of a secondary dwelling.
F
16 Francis Street, Fairlight – DA2025/0494
Exhibition Period: 21/05/2025 to 04/06/2025
Cost of Work: $748,000
Alterations and additions to a house.
147 Frenchs Forest Road West, Frenchs Forest – DA2025/0506
Exhibition Period: 26/05/2025 to 09/06/2025
Cost of Work: $423,500
Alterations and additions to a house.
36 Cook Street, Forestville – DA2025/0503
Exhibition Period: Not yet determined at time of publication
Cost of Work: $67,750
Construction of a carport.
I
22 Cicada Glen Road, Ingleside – DA2025/0432
Exhibition Period: 21/05/2025 to 04/06/2025
Cost of Work: $1,091,517
Demolition works and construction of a house.
M
Units 2 & 5, 60 Bower Street, Manly – DA2025/0495
Exhibition Period: 21/05/2025 to 04/06/2025
Cost of Work: $748,605
It is proposed to unseal the existing staircase linking units 2 and 5 and provide alterations including the removal and replacement of walls, finishes, doors and windows. The proposal also includes some minor changes to the common property storage rooms.
15 Pitt Street, Manly Vale – DA2025/0515
Exhibition Period: 26/05/2025 to 09/06/2025
Cost of Work: $1,498,320
Construction of a house.
N
10 Hollywood Road, Newport – DA2025/0528
Exhibition Period: 26/05/2025 to 09/06/2025
Cost of Work: $250,352
Alterations and additions to a house.
138 Prince Alfred Parade, Newport – DA2025/0489
Exhibition Period: 22/05/2025 to 05/06/2025
Cost of Work: $2,671,666
Alterations and additions to a house.
1 Suncrest Avenue, Newport – DA2025/0520
Exhibition Period: 26/05/2025 to 09/06/2025
Cost of Work: $462,000
Alterations and additions to a house.
67 Woolgoolga Street, North Balgowlah – DA2025/0474
Exhibition Period: 21/05/2025 to 04/06/2025
Cost of Work: $1,309,550
Construction of a house, including a swimming pool.
P
1 Livistona Lane, Palm Beach – DA2025/0487
Exhibition Period: 21/05/2025 to 04/06/2025
Cost of Work: $294,800
Alterations and additions to a house.
24 Norma Road, Palm Beach – DA2025/0433
Exhibition Period: 21/05/2025 to 04/06/2025
Cost of Work: $6,608,242
Demolition works and construction of a house.