Would you like to support local journalism?

(with some quirky flair)

Regular News FEEDINGS via social + online. by locals for locals.

HomeNews$70 million three-storey self-storage units and warehouse in Frenchs Forest and more...

$70 million three-storey self-storage units and warehouse in Frenchs Forest and more in this week’s Development Application round up

Manly Observer provides a weekly summary of development applications lodged with Northern Beaches Council in the last week.

While every effort has been made to accurately represent the development applications, we recommend clicking the link (the DA number in the heading) which will take you to the relevant council page with detailed information.

Where exhibition periods have not yet been determined at the time of publication, Council is still gathering the required documention needed before notifying relevant parties. Once the exhibition period opens, there will be a link on the DA page for submissions – please refrain from submitting prior to this link becoming available.

A

22 Tobruk Avenue, Allambie Heights – DA2025/0569

Exhibition Period: 06/06/2025 to 20/06/2025

Cost of Work: $49,500

Alterations and additions to a house.

16 Cabarita Road, Avalon Beach – DA2025/0598

Exhibition Period: 10/06/2025 to 24/06/2025

Cost of Work: $109,739

Alterations and additions to a house, including a lift.

3 Coolawin Road, Avalon Beach – DA2025/0582

Exhibition Period: 05/06/2025 to 19/06/2025

Cost of Work: $348,700

Alterations and additions to a house, including a swimming pool.

14 Hudson Parade, Avalon Beach – DA2025/0552

Exhibition Period: 06/06/2025 to 20/06/2025

Cost of Work: $237,305

Construction of a secondary dwelling.

B

31 Argyle Street, Bilgola Plateau – DA2025/0492

Exhibition Period: 05/06/2025 to 19/06/2025

Cost of Work: $94,050

Demolition works and construction of a swimming pool.

C

69 Gordon Street, Clontarf – DA2025/0589

Exhibition Period: 05/06/2025 to 19/06/2025

Cost of Work: $2,361,367

Demolition works and construction of a house and swimming pool.

69 Gordon Street, Clontarf – DA2025/0589. Image: sketchArc

73 Telopea Street, Collaroy Plateau – DA2025/0571

Exhibition Period: 04/06/2025 to 18/06/2025

Cost of Work: $387,200

Alterations and additions to a house, including a swimming pool.

66 Carrington Parade, Curl Curl – DA2025/0587

Exhibition Period: 06/06/2025 to 20/06/2025

Cost of Work: $915,863

Alterations and additions to a house, including a spa.

D

47 Aranda Drive, Davidson – DA2025/0540

Exhibition Period: 09/06/2025 to 23/06/2025

Cost of Work: $370

Additional use of premises as a home business.

E

31 – 33 Sturdee Lane, Elvina Bay – DA2025/0603

Exhibition Period: Not yet determined at time of publication

Cost of Work: $240,000

Construction of an inclinator and associated works.

F

14 Aquatic Drive, Frenchs Forest – DA2025/0533

Exhibition Period: 06/06/2025 to 27/06/2025

Cost of Work: $69,476,000

Demolition of existing building and structures, construction of self-storage units and warehouse and associated uses.

The proposal is Regionally Significant Development (RSD) as it is general development with an estimated development in excess of $30 million. Therefore, the Sydney North Planning Panel is the consent authority.

14 Aquatic Drive, Frenchs Forest – DA2025/0533. Image: sba

The proposed development comprises construction of a three-storey building comprising:

  • demolition of existing buildings and structures on the site
  • 153 self-storage units at ground floor and Level 1
  • 72 warehouse units on Levels 1 and 2
  • 123 car parking spaces across all levels
  • outdoor breakout spaces for staff at ground floor and Level 2
  • shared lobby across all levels
  • landscaping; and
  • associated infrastructure/servicing works.

Approval is sought for 24/7 operation of both the self-storage and warehouse and distribution units

54 Rangers Retreat Road, Frenchs Forest – DA2025/0594

Exhibition Period: 06/06/2025 to 20/06/2025

Cost of Work: $1,889,038

Construction of a house.


54 Rangers Retreat Road, Frenchs Forest – DA2025/0594. Image: Homestead Home Builders

7/69 Evans Street, Freshwater – DA2025/0517

Exhibition Period: Not yet determined at time of publication

Cost of Work: $0

Use of Unit 7 garage as habitable floor area.

35 Moore Road, Freshwater – DA2025/0599

Exhibition Period: 09/06/2025 to 23/06/2025

Cost of Work: $2,340,211

Demolition works and construction of a dual occupancy (attached) including strata subdivision.

35 Moore Road, Freshwater – DA2025/0599. Image: Action Plans

M

67 Eurobin Avenue, Manly – DA2025/0547

Exhibition Period: 04/06/2025 to 18/06/2025

Cost of Work: $1,050,500

Alterations and additions to a house.

14 Addiscombe Road, Manly Vale – DA2025/0583

Exhibition Period: 05/06/2025 to 19/06/2025

Cost of Work: $186,450

Construction of a swimming pool and hardstand parking area.

N

209 – 211 Ocean Street, Narrabeen – DA2025/0541

Exhibition Period: 05/06/2025 to 19/06/2025

Cost of Work: $454,520

Alterations and additions to an existing shop top housing development. Specifically, the application proposes new external cladding, the extension of the existing awning over the residential lobby entrance and the creation of winter gardens to a number of residential balconies through the introduction of a sliding glazed window system to the balcony perimeter.

It also proposes cladding changes to the works approved pursuant to development consent DA2017/1136 involving the construction of an additional upper-level apartment. None of the proposed works have commenced on site.


209 – 211 Ocean Street, Narrabeen – DA2025/0541. Image: Boston Blyth Fleming Pty Ltd

48 Park Street, Narrabeen – DA2025/0602

Exhibition Period: Not yet determined at time of publication

Cost of Work: $1,550,000

Construction of a house, including a swimming pool.

34 Prince Alfred Parade, Newport – DA2025/0588

Exhibition Period: 06/06/2025 to 20/06/2025

Cost of Work: $2,699,387

Construction of a house, swimming pool and secondary dwelling.

34 Prince Alfred Parade, Newport – DA2025/0588. Image: marker

2 Bardoo Avenue, North Balgowlah – DA2025/0601

Exhibition Period: 10/06/2025 to 24/06/2025

Cost of Work: $1,950,000

Demolition works and construction of a dual occupancy (detached) including a swimming pool and strata subdivision.


2 Bardoo Avenue, North Balgowlah – DA2025/0601. Image: DU PLESSIS ARCHITECTS

52A Abbott Road, North Curl Curl – DA2025/0605

Exhibition Period: Not yet determined at time of publication

Cost of Work: $2,393,458

Demolition works and construction of a dual occupancy (attached) including swimming pools and strata subdivision.


52A Abbott Road, North Curl Curl – DA2025/0605. Image: Action Plans

49 Tatiara Crescent, North Narrabeen – DA2025/0591

Exhibition Period: 05/06/2025 to 19/06/2025

Cost of Work: $363,000

Alterations and additions to a house.

P

1005 – 1009 Barrenjoey Road, Palm Beach – DA2025/0570

Exhibition Period: Not yet determined at time of publication

Cost of Work: $8,135,000

Demolition works and construction of a house, including a swimming pool, cabana and sport court.

1005 – 1009 Barrenjoey Road, Palm Beach – DA2025/0570. Image: KENNON

32 Iluka Road, Palm Beach – DA2025/0577

Exhibition Period: 04/06/2025 to 18/06/2025

Cost of Work: $638,000

Alterations and additions to a house.

S

69 Wakehurst Parkway, Seaforth – DA2025/0586

Exhibition Period: 09/06/2025 to 23/06/2025

Cost of Work: $406,880

Alterations and additions to a house.

W

44 Arnott Crescent, Warriewood – DA2025/0567

Exhibition Period: 05/06/2025 to 19/06/2025

Cost of Work: $1,540,000

Alterations and additions to a house.

Check out these developments on the Northern Beaches:

$8 million Warringah Golf Club House approved for Warringah Recreation Centre

Wesley Gardens Belrose to get a $200 million seniors’ community upgrade

Contribute to support the Manly Observer's independent local journalism

Become a MO supporter

News